Maximise real power export

Our tools identify losses across entire portfolios and provide tailored solutions, focusing on reactive power issues. Our grid modelling identifies these challenges early in the design stage and recommends necessary changes.

What We Do:

  • Diagnoses control system inefficiencies and resolves them through site-specific power flow modelling - determining ideal equipment setpoints and for peak performance.
  • Advanced algorithms to optimise site design, equipment sizing and layout
  • Analyse entire portfolios to identify, quantify and solve for many complex power issues.
Solar Farm Panels

How It Works

Our advanced platform optimizes equipment selection and performance for both new and existing solar installations.

For New Solar Installations

We use power factor grid modeling to predict performance at the point of connection and optimize equipment before construction.

1. Grid Modeling

Understand grid conditions at the point of connection to optimize equipment sizing, tap settings, and reactive power production.

2. Site Analysis

Analyze power flow simulations to identify potential reactive power issues and quantify their impact on real power output and equipment efficiency.

3. Equipment and Layout

Optimize equipment selection, sizing, and layout to maximize real power export while ensuring compliance with grid requirements and minimizing costs.

Key Features

Our platform identifies inefficiencies in solar site design and control regimes, focusing on reactive power requirements that are typically overlooked in the pre-build phase.

Advanced Simulation

Identify and simulate reactive power requirements that are typically overlooked during pre-build planning.

Intelligent Optimization

Ensure adequate and sensible equipment sizing and system design to address reactive power inefficiencies, rather than focusing solely on individual equipment efficiency.

Portfolio Assessment

Rapidly assess entire portfolios to identify sites suffering from unaccounted reactive power issues and implement targeted solutions.

Case Studies

Discover how DolivoGen has helped solar developers and asset managers optimize their installations through precise equipment sizing and performance enhancement.

Desert Sun Solar Farm

50MW Installation

Achieved 15% increase in real power output through adequate equipment sizing and sensible system design, not by increasing individual equipment efficiency.

Mountain View Array

25MW Installation

Reduced equipment losses by 20% through advanced simulation and optimization recommendations.

Coastal Energy Project

75MW Installation

Optimized transformer sizing resulting in $2M savings in equipment costs.

Financial Planning

Make informed decisions with our comprehensive financial analysis tools.

Total Investment

$300,000

Equipment + Infrastructure

Annual Revenue Increase

$120,000

Additional revenue per year

Payback Period

2.5 Years

Time to recover investment

ROI

40.0%

Annual return on investment

Equipment Recommendations

Suggested upgrades to optimize your solar farm performance

Infrastructure Costs

Additional costs required for implementation

Installation Labor$45,000
Electrical Infrastructure$25,000
System Integration$10,000
Total Infrastructure Cost$80,000

Investment Timeline

Projected return on investment over time

Year 1$120,000
Year 2$240,000
Year 3$360,000
Investment recovered
Year 4$480,000
Investment recovered
Year 5$600,000
Investment recovered

Get in Touch

Ready to optimize your solar farm? Contact us for a demo or more information.

Include any specific requirements or questions you have.